Marine & Waterfront Construction Services in New Braunfels
We handle marine and waterfront construction across New Braunfels and the Guadalupe Valley lakes; each build is engineered for the lake it sits on. One team carries the whole project so your shoreline holds and your waterfront stays solid for decades.
In-House Permitting Team
Custom Designs
Responsive And Personal
FREE PERMITTING | $2,500 VALUE
Request Your Free Consultation
Marine and Waterfront Construction in New Braunfels
Marine construction and waterfront construction are the same work, and together they cover everything Lakeside Structures builds on, over, and at the edge of the Guadalupe Valley lakes: stationary docks, piers, boathouses, boat lifts, seawalls, bulkheads, retaining walls, the pilings under all of it, and the repair and restoration work that keeps a waterfront in service for decades. We build the full range on Lake Dunlap, Lake McQueeney, Lake Placid, and Meadow Lake, engineered, permitted, and built by one team instead of a different contractor for every structure.
Working with one marine construction contractor for the whole waterfront means:
- Every structure type built and repaired, from a single dock to a full shoreline rebuild
- One team that files every permit, county, city, and GBRA, in the order each requires
- A full barge fleet that reaches shorelines land equipment cannot
- 23 years of Central Texas experience, on these lakes since 2002
- One point of contact from the first site visit to the final walkthrough
That is the standard every project on this page is held to, whichever structure brings you here.
Marine and Waterfront Construction Services in New Braunfels
Waterfront projects go better when one contractor carries the whole scope. As marine construction contractors in New Braunfels, we build everything below: over the water, at the shoreline, below the waterline, and on the structures you already own. Each card opens the page that covers that work in full.
Dock Construction
Improve access to your waterfront with a well-built dock designed for your property. Our New Braunfels dock construction services give you a stable place for your family to access the water comfortably, making the shoreline easier to use.
Pier Construction
If you need length more than deck space, a pier may suit your property better than a full dock. Learn how our New Braunfels pier construction works, from sizing the walkway to adding a landing for boarding and fishing.
Boathouse Construction
A boathouse is the largest structure most owners have on their shoreline. Early decisions like slip size, lift capacity, and roof design help decide how its built. Get insights into how we plan and build your New Braunfels boathouse, including the GBRA permit you’ll need before construction begins.
Boat Lift Installation
Lift your boat out of the water and cut down on hull cleaning, bumping against the dock, and the wear that builds up over time. With our boat lift installation for New Braunfels waterfront properties, your boat stays secure and ready to launch whenever you are.
Seawall Construction
Protect your yard and landscaping with a seawall that holds your bank firm and limits erosion. Our New Braunfels seawall construction service keeps your shoreline stable through wakes and high water, giving you a solid base for a dock or boathouse.
Bulkhead Construction
Turn your uneven bank into level, usable ground with a bulkhead, giving you more space to build on and enjoy your property. With bulkhead construction for New Braunfels lakefront homes, we hold the soil along your shoreline in place so the ground stays firm for a dock, patio or seating area.
Waterfront Retaining Wall Construction
Shape a steep lakefront slope into terraced levels with a retaining wall, so you have room for steps, gardens, and outdoor living between your home and the water. We handle waterfront retaining wall construction in New Braunfels, with walls built to hold your hillside and shoreline firmly in place.
Pile Driving
Build your dock, pier, or boathouse on pilings driven deep into the lakebed, giving the structure a solid foundation that stays level and steady. Our crew and barge handles pile driving on New Braunfels lakes, setting each piling to match the load your structure will carry.
Dock Pilings Installation
Give your dock the support it needs with new pilings that keep the deck level and firm underfoot, whether you’re building new or replacing worn posts. We offer dock pilings installation for New Braunfels waterfront owners, with each piling sized and placed to carry your dock and everything on it.
Marine Repair Services
Fix worn decking, loose railings, and weakened supports, keeping your dock or boathouse safe to use without the cost of a full rebuild. We provide marine repair services across New Braunfels and focus each job on the parts that need attention.
Waterfront Restoration
Bring an aging or storm-damaged waterfront back to full use by restoring the shoreline and the structures along it, giving you a lakefront your family can enjoy again. New Braunfels waterfront restoration with Lakeside Structures is planned as one coordinated project, so your walls, dock, and shoreline come back together instead of through piecemeal fixes.
Our Approach to Marine Construction in New Braunfels
Most owners come to us with one structure in mind and a second or third in the back of their head. Our four stages are built around that, because the order the pieces get built in decides how well they work together.
Consultation and Site Evaluation
We start with a free walkthrough of your whole shoreline, not just the structure you called about. We measure water depth and bottom conditions, read the bank, and confirm which floodplain office and which GBRA rules apply to your lot before we plan anything.
Engineering and Design
Shoreline protection is designed first, since a dock framed off a bank that gets rebuilt won’t line up right. Pilings are engineered to the finished plan, with lift and roof loads and GBRA’s 12-foot drawdown standard built in.
The dock sets the layout for the lift and boathouse, and all three match the same water level. You approve the plan before material is ordered.
Permitting and Coordination
Every structure on a GBRA lake needs a construction permit, and GBRA wants the county floodplain approval, and the city’s where it applies, in hand first.
Our in-house permitting team files the whole project as one package, in that order, so each review runs once instead of restarting for every structure. Permitting drives the schedule, so it starts early.
Construction and Final Walkthrough
The barge mobilizes once and the phases run in the order the design set: wall, pilings, dock, then lift and boathouse. A supervisor is on site daily, and we close with a walkthrough of the whole waterfront and a clean shoreline.
Who Regulates Marine Construction on Your New Braunfels Lake
Three reviews stand between a New Braunfels waterfront owner and a start date, and GBRA’s is the last of them, not the first.
The County Floodplain Office Signs Off First
GBRA asks for written proof that your county has approved the project before it will issue its own permit. Lake McQueeney, Lake Placid, and Meadow Lake require a Guadalupe County Floodplain Development Permit that covers all development in a regulated flood zone. Boat docks and retaining walls are named specifically, and a decision is due within 30 days. Lake Dunlap lots fall under Guadalupe County or, toward New Braunfels, Comal County, where the permit runs through the County Engineer’s Office on a scaled site drawing and proof of ownership. We prepare the county filing and get it in ahead of the GBRA request.
City Review Inside New Braunfels or Seguin
If your lot is inside New Braunfels city limits, the city’s own Floodplain Development Permit applies to any development in the floodplain, and GBRA lists that approval among the ones it wants to see. Seguin plays the same role on the lakes beside it. Whether your property sits inside city limits or just outside them changes which office you answer to, and it is one of the first things we confirm at the site evaluation.
GBRA Permits Every Structure on the Water
The Guadalupe-Blanco River Authority owns and operates all four lakes. Anyone planning to construct or modify a dock or other waterfront structure needs its construction permit, and as of September 1, 2026 the application carries a $600 fee on Dunlap, McQueeney, and Placid. GBRA approves the location only, but it sets two standards you design to: piers may not extend more than 20 feet into the water, and the structure must withstand the lake being lowered by as much as 12 feet. Construction has to finish within twelve months of approval. Routine and preventative maintenance on a permitted structure needs no new permit or fee; you notify GBRA and carry on. Our in-house permitting team prepares the GBRA application with the drawings it requires and tracks the twelve-month clock.
Exact requirements depend on your lot and scope. We confirm every one before you commit.
Waterfront Areas We Serve Around New Braunfels
The Guadalupe Valley lakes are run as constant-level lakes, which is why fixed, engineered structures are the right fit for waterfront construction around New Braunfels, and why GBRA still requires every one of them to survive a 12-foot drawdown. Three of the four are back to normal pool after dam reconstruction. Meadow Lake is not yet. Here is where each stands and what it suits.
Lake Dunlap
The closest of the four to New Braunfels. GBRA completed the new spillgate system in October 2023 and restored the lake, and shoreline investment has followed the water back. Dunlap suits the full range of work, from new docks and boathouses to bulkhead replacement on developed frontage. It is also the lake where city-limits and county lines most often decide which floodplain office you file with.
| Governing authority | Guadalupe-Blanco River Authority (GBRA); Lake Dunlap WCID |
|---|---|
| Dam and water level (as of September 2026) | New spillgate system completed October 2023; at normal pool |
| Construction approval | GBRA construction permit before any new or modified structure; $600 application fee from September 1, 2026 |
| Structure standards | Built to withstand a 12-foot lowering of the lake; piers no more than 20 feet into the water |
| Local floodplain review | Guadalupe or Comal County Floodplain Development Permit; City of New Braunfels inside city limits |
Lake McQueeney
The valley’s classic recreation lake. GBRA finished the new spillgate system in March 2026 and the lake returned to normal pool in April. Owners are repairing what the drawdown years exposed and building the projects they postponed. McQueeney suits docks with lifts and boathouses along its main body, and its GBRA-mapped safety and no-wake zones shape where a structure can sit near the channel.
| Governing authority | Guadalupe-Blanco River Authority (GBRA); Lake McQueeney WCID |
|---|---|
| Dam and water level (as of September 2026) | New spillgate system completed March 2026; normal pool since April 2026 |
| Construction approval | GBRA construction permit before any new or modified structure; $600 application fee from September 1, 2026 |
| Structure standards | Built to withstand a 12-foot lowering of the lake; piers no more than 20 feet into the water |
| Local floodplain review | Guadalupe County Floodplain Development Permit; City of Seguin where the lot is inside city limits |
Lake Placid
Just downstream of McQueeney and part of the same restoration program. Its spillgate system was completed in February 2026 and the lake returned to normal pool in April. Placid’s quieter water suits swim platforms, piers, and boathouse projects, and its shoreline is entering the same rebuild cycle as its upstream neighbor. GBRA’s 20-foot pier limit is the first number we check against any pier or platform sketch here.
| Governing authority | Guadalupe-Blanco River Authority (GBRA); Lake Placid WCID No. 1 |
|---|---|
| Dam and water level (as of September 2026) | New spillgate system completed February 2026; normal pool since April 2026 |
| Construction approval | GBRA construction permit before any new or modified structure; $600 application fee from September 1, 2026 |
| Structure standards | Built to withstand a 12-foot lowering of the lake; piers no more than 20 feet into the water |
| Local floodplain review | Guadalupe County Floodplain Development Permit; City of Seguin where the lot is inside city limits |
Meadow Lake
Meadow’s spill gates were lowered for safety in 2023 and the lake remains drawn down. The lake district reported in August 2026 that dam design and TCEQ approval are expected by the end of November, with contractor selection to follow, so restoration is still ahead. For owners that is a genuine window: dry access and full visibility of pilings, walls, and lakebed make shoreline protection and foundation work the right projects now, and over-water structures the ones to design for the water’s return. We confirm status with GBRA before planning any Meadow Lake work.
| Governing authority | Guadalupe-Blanco River Authority (GBRA); Meadow Lake WCID |
|---|---|
| Dam and water level (as of September 2026) | Spillgate replacement in pre-construction; design and TCEQ approval expected by end of November 2026; below normal pool since 2023 |
| Construction approval | GBRA construction permit before any new or modified structure |
| Structure standards | Built to withstand a 12-foot lowering of the lake; piers no more than 20 feet into the water |
| Local floodplain review | Guadalupe County Floodplain Development Permit; City of Seguin where the lot is inside city limits |
Premium Waterfront Construction For Central Texas Properties
Lakeside Structures plans and builds high-end waterfront projects with the structure, communication, and permitting oversight property owners need. Whether the project involves shoreline protection, dock construction, a custom boathouse, or a larger marine build, our team delivers reliable execution from site review through final walkthrough.
23+
Years in business building premium waterfront structures
300+
Completed projects with structured execution and daily oversight
5★
Rated with in-house permitting, custom designs, and responsive service
Custom Waterfront Structures
Bulkheads, docks, boathouses, seawalls, and marine construction delivered with structured execution, responsive communication, and in-house permitting across Central Texas.
What Makes Lakeside Structures Your Ideal Marine Construction Company
Building on a GBRA lake takes more than a crew and a truck. Here is what we bring to every New Braunfels project, and why it matters before the first piling goes in.
In-House Permitting Expertise
Waterfront permits in New Braunfels run through the county floodplain office, the city where it applies, and then GBRA. Our in-house team files all three in the right order and manages yours from submittal to approval.
Full Barge Fleet and Heavy Equipment
Our barges drive the pilings under docks, piers, and boathouses and carry materials to properties that land equipment cannot reach. Owning the fleet means your schedule never waits on a subcontractor.
23 Years of Central Texas Experience
We have built on the New Braunfels lakes since 2002. That history means we read the Guadalupe’s bank soils and flood record before we design a single structure.
Reliable Communication
You get one point of contact from the first call on. We always answer the phone and we show up when we say we will. Someone from our team runs the site every day of the build.
Most of our jobs come from referrals and repeat clients. That is the kind of trust you earn one finished dock at a time.
Structural Engineering Focus
Every structure we build carries real loads in moving water. We engineer the connections and anchoring for the conditions at your site.
Similar Marine Construction Projects
Waterfront builds we have completed across the Central Texas lakes.
These projects show the range of marine construction we handle around Central Texas and New Braunfels, from single structures to full multi-structure waterfronts, and how we approach whatever your shoreline needs.

Lake Placid Shoreline Stabilization
At Lake Placid, the property owner contacted Lakeside Structures to address a failed concrete bulkhead that had settled and become underwashed, compromising the stability of the shoreline.
View project →
Treasure Island Waterfront Transformation
At Treasure Island, this property featured a heavily overgrown shoreline that limited both access and usability.
View project →
Lake Dunlap Boathouse Restoration
At Lake Dunlap, the property owner contacted Lakeside Structures to address a failing structural issue beneath an existing concrete slab at their boathouse.
View project →Marine Construction in New Braunfels and Surrounding Areas
We build and protect waterfront properties across New Braunfels and Central Texas, from docks and boathouses to seawalls and shoreline repair.
Wherever your project sits on the water, you get the same careful engineering and hands-on management.
New Braunfels
- New Braunfels
- Lake McQueeney
- Lake Dunlap
Guadalupe River Chain of Lakes
- Guadalupe River
- Lake Placid
- Meadow Lake
Austin Metro Area
- Lake Travis
- Lake Austin
- Surrounding Hill Country lakes
Central Texas Coverage
- Austin Metro
- New Braunfels Region
- Central Texas lake communities
Client Reviews For Dock & Marine Construction Projects
5.0 / 5.0
Most of our business comes from referrals. Clients choose our marine construction services because they trust us to manage the structural and regulatory complexity of waterfront projects and coordinate with the right professionals and agencies when needed.
Terri S
Trustin V.
Western R
Melissa W. – They will make you glad you chose them.
Rick F. – Highly recommended.
David S.- Professional job
Pete T. – Honest and straightforward.
Marine Construction Services For Bulkheads, Docks, And Waterfront Structures
New Braunfels Marine and Waterfront Construction FAQs
01.
Can One Company Build My Entire Waterfront in New Braunfels?
Yes, one company can build your entire waterfront in New Braunfels, but few are set up to. Check for four things:
- A barge for over-water work
- Equipment that can drive pilings and set walls
- A crew with a build history on your lake
- In-house permitting across every authority that reviews the project
We meet all four. The result is one plan, one team, and one point of contact from the seawall to the boathouse roof.
02.
What Does a Full Waterfront Build Include?
A full waterfront build includes shoreline protection, the pilings and foundations under everything, the dock or pier, and then the boathouse and lift that attach to it. Everything is planned around what your shoreline needs, and not every property needs every piece.
A stable bank with good depth may need only a dock and lift. An eroding bank needs the wall first, and the rest follows.
03.
Do You Need a Permit for Waterfront Construction on the Guadalupe River Lakes?
Yes. GBRA requires a construction permit before anyone builds or modifies a dock or other waterfront structure on the Guadalupe Valley lakes. Since September 1, 2026 the application carries a $600 fee.
GBRA also wants your county floodplain approval first, and the city's if you are inside New Braunfels or Seguin limits. We file all of them for you, in that order.
04.
Are the New Braunfels Lakes Back to Normal Levels?
Three of the four are back. Lake Dunlap has been at normal pool since October 2023. Lake McQueeney and Lake Placid returned to normal pool in April 2026 as their new spillgate systems came online.
Meadow Lake remains lowered; its district expects dam design approval by late November 2026, with construction still ahead. We confirm current GBRA lake status at your site evaluation.
05.
How Do I Choose a Marine Contractor in New Braunfels?
Start with proof of work on your actual lake. Then ask who files the permits and how the job is managed day to day.
Confirm the contractor is licensed and insured for marine construction in Texas, and make sure commitments show up in writing.
06.
Can You Manage a Project If I Live Out of State?
Yes, we can manage your waterfront project if you live out of state. Many of our clients own lake property they cannot visit weekly.
You get one point of contact and daily on-site management, and you hear from us before you have to ask.
Pricing & Contracts
01.
How Much Does Marine Construction Cost in New Braunfels?
Marine construction in New Braunfels costs different amounts by structure, so the honest answer is a range of averages rather than one number. National cost guides put full waterfront projects at roughly $100,000 on average. The same guides put custom stationary docks anywhere from about $30,000 into seven figures for large multi-structure builds.
Those are averages drawn from current industry cost guides. The variables that matter most are shoreline condition, water depth, barge access, structure size, materials, and permitting scope.
One honest caveat before you budget: those numbers are averages, not a quote. Every shoreline is different, and your final price can land higher or lower once we see your site's condition, depth, access, and permitting picture. The written proposal from your free on-site consultation is the figure you can actually plan around.
Expertise & Credentials
01.
Do you build custom docks and boathouses?
Yes. We design and build custom docks, piers, boathouses, and related waterfront structures based on the property, water conditions, vessel needs, and how you want to use the space.
02.
Do you handle permitting?
Many marine construction projects require permits, depending on the structure, location, and local requirements. Our in-house team manages the required city, county, and environmental approvals.
03.
Are you licensed and insured for Marine Construction projects in Texas?
Yes. Lakeside Structures is fully licensed and insured specifically for marine construction in Texas, protecting your property and our crew.
04.
Why choose you over other marine construction contractors?
Marine construction services require specialized experience, equipment, and permitting knowledge. Lakeside Structures comes with 23+ years in Central Texas, in-house permitting, and marine construction equipment built for waterfront sites. We are equipped for complex shoreline projects.
Need more answers or have other questions? We’re here to chat with you!
Start Your Waterfront Construction Project in New Braunfels With Us
Schedule a site assessment and get a detailed proposal for your marine construction project.
We’ll meet you on-site to evaluate your property, discuss your goals, and provide a transparent estimate. No pressure. No generic quotes. Just clear answers and a path forward.
